Inspection
Measure a temperature.• | The temperature of wheel surface grip must rise from -20°C to 20°C within 6 minute |
• | The temperature of wheel surface grip must keep 38°C ± 4°C after 25 minute |
• | At that time switch on, all measure point (1~8) |
Repair procedures
Inspection
1.
After disconnecting the vapor hose from the PCV valve,
remove the PCV valve. Visually check for a collapsed vapor hose or hose
leaks.
2.
...
Engine Number
1.
Engine fuel
- G : Gasoline
2.
Engine range
- 4 : 4 cycle 4 cylinder
3.
Engine development order
and capacity- K : Theta ...
Jump Starting Procedure
1. Make sure the booster battery is 12-volt and that its negative terminal is
grounded.
2. If the booster battery is in another vehicle, do not allow the vehicles to
touch.
3. Turn off all unnec ...