Inspection
First Seat Heater1. | Check for continuity and measure
the resistance between No.4 and No.6 terminals. [Cushion]
[Back]
|
2. | Operate the seat heater after
connecting the connector, and then check the thermostat by measuring the
temperature of seat surface.
|
Turn Signals
The ignition switch must be on for the turn signals to function. To turn on the
turn signals, move the lever up or down. Green arrow indicators on the instrument
panel indicate which turn signal ...
26 Brake Control Solenoid Valve(26/B_VFS). Schematic Diagrams
Circuit Diagram
...
Installation
1.
Install the key lock cylinder.
2.
Install the key warning switch
and key Illumination.
3.
Install the key warning/immobilizer
connector.
...