1. | Reassemble the CVVT assembly
(A) and camshaft (B).
|
ECM Problem Inspection Procedure
1.
TEST ECM GROUND CIRCUIT: Measure resistance between
ECM and chassis ground using the backside of ECM harness connector as
ECM side check point. If the problem is found, repa ...
Electrical System
1.
Be sure to disconnect the
battery cable from the negative (-) terminal of the battery.
2.
Never pull on the wires
when disconnecting connectors.
...
Installation
1.
With a knife, scrape the old
adhesive smooth to a thickness of about 2mm (0.08 in.) on the bonding surface
around the entire rear window glass opening flange :
A.
D ...